首页 知识详情

新概念2第64课摘要写作

网校学员ur4**在学习新概念英语2、3、4册连读【双11专享班】时提出了此问题,已有1人帮助了TA。

网校助教

清醒季smile

同学你好,该知识点来自沪江网校《新概念英语2、3、4册连读【双11专享班】》的课程,想要更系统的学习,欢迎进入课程学习。不仅可以和更多的同学一起学习,而且还有老师、助教随时的学习指导和知识点解答哦。

同学你好~
The tunnel, which the French engineer, Aimé Thomé, planned to
build under the English Channel in 1858, would be ventilated by
tall chimneys built above sea level. An Englishman, William Lowe,
suggested a better plan two years later. Passing trains would solve
the problem of ventilation in his proposed double railwaytunnel
because they would draw in fresh air behind them. Though work began
forty-two years later, it was stopped because the British feared
invasion. However, the tunnel was officially opened on March 7, 1994.
(85 words)

祝同学学习进步~

版权申明:知识和讨论来自课程:《新概念英语2、3、4册连读【双11专享班】》的学员和老师,如果想了解更多,可以报名参加课程学习。所有知识讨论内容,版权归作者及沪江网校所有。